1
2
Your DetailsReview & Pay

Ordering

Preliminary Site Plan

Delivered in First-hour summary; full site plan in 2–5 days

$249.00

change

Tell us what you want to test on the property

Confirm the parcel, proposed footprint, available source documents, and site questions. Your progress saves on this device.

Preliminary Site Plan project example

Two simple screens

Choose, upload, review.

Common answers are preselected. Add project files if required, then review before checkout.

1Confirm choices
2Add files
3Review & pay

Automatic property lookup — available nationwide

Kealee identifies the state, county, and city for any US address, then pulls parcel geometry where a registered jurisdiction service covers it. Where it does not, the order continues under manual review — automation level varies by location, availability does not.

Quick-start project profile

Common goals, constraints, priorities, budget, and timeline are pre-filled below for this service. Change any choice that does not fit; the project brief is the single custom notes field.

Leave the prefilled description unchanged when it fits your project.

Quick project choices

Common answers are selected. Tap only what you want to change.

What matters most?

Optionally upload street, front/rear yard, boundary-marker, access, slope, drainage, utility, or proposed-footprint photos. Accepted: JPG, PNG.

Prefer to talk? Describe the property, project area, and what you want changed. A photo, sketch, or voice description is required.

Upload any available survey, plat, parcel map, zoning exhibit, easement document, GeoJSON exported as a supported document, or existing site plan.

🔒 Secure payment powered by Stripe. You won't be charged until the next step.

Your Package

Preliminary Site Plan

$249.00
Delivered in First-hour summary; full site plan in 2–5 days Secure checkout via Stripe

What's Included

  • Property and parcel intake with jurisdiction identification (nationwide)
  • Available parcel and zoning source summary, each labelled with its source and date
  • Preliminary setbacks, lot coverage, and overlay findings where published data exists
  • Access, parking, grading/drainage, utility, stormwater, and flood or environmental flags where data is available
  • Preliminary buildable-area diagram and one proposed footprint
  • Coverage level, confidence, and the list of items still requiring confirmation
  • Preliminary and not for construction unless professionally reviewed. Not a boundary survey. Source coverage and accuracy vary by jurisdiction.

Your package purchase is credited toward the next phase

100% of this package fee can be applied once toward eligible Kealee professional design or managed-build services for the same project.

Credit requires a later written Kealee scope for the same project, cannot exceed that later service fee, has no cash value, is non-transferable, and cannot be combined with another purchase credit unless the written scope says otherwise.

Browse all packages →
AI Project Insight
Analyzing your project type...

Need help?

Ask a quick question without leaving this intake. Checkout stays above.