estimation

Detailed Construction Estimate

A documented planning estimate organized by trade, quantities, assumptions, and regional references.

What you receive

  • Trade-by-trade cost breakdown
  • Material and labor planning ranges
  • Quantity and scope assumptions
  • Regional cost reference basis
  • Allowances, exclusions, and risk notes

What we need

  • Project location and scope
  • Plans, photos, or measurements
  • Finish level and target schedule

Three steps

From intake to a usable decision

01

Submit project information

Project location and scope, Plans, photos, or measurements, Finish level and target schedule.

02

Kealee prepares and reviews

We organize the purchased scope and prepare the detailed construction estimate with stated assumptions and source labels.

03

Download and advance

Use the estimate for scope decisions, bid comparison, or professional estimate review.

Platform-generated sample output

See the estimate structure customers receive.

Representative, anonymized examples showing Kealee’s trade breakdown, measured basis, planning cost and scope assumptions. These are sample outputs—not bids or guaranteed prices.

Kitchen renovation estimate

Existing kitchen demolition, new cabinetry, counters, finishes, plumbing and electrical allowances

TradeBasisPlanning cost
Selective demolition1 LS$6,800
Cabinetry and millwork32 LF$24,960
Electrical and lighting1 LS$9,450
Plumbing and fixtures1 LS$8,900
Total planning range$78,400–$92,600

Includes explicit assumptions, allowances, exclusions, regional source basis and risk notes in the delivered report.

Rear addition estimate

Foundation, framing, envelope, MEP extensions and interior finish planning

TradeBasisPlanning cost
Sitework and concrete420 SF$38,600
Structural framing420 SF$46,200
Exterior envelope1 LS$31,800
MEP extensions1 LS$27,500
Total planning range$186,000–$224,000

Includes explicit assumptions, allowances, exclusions, regional source basis and risk notes in the delivered report.

Whole-home renovation estimate

Trade-organized planning range with quantities, allowances, exclusions and risk notes

TradeBasisPlanning cost
Interior construction2,450 SF$84,300
Mechanical systems1 LS$42,700
Electrical systems1 LS$36,900
Finish allowance2,450 SF$96,500
Total planning range$312,000–$378,000

Includes explicit assumptions, allowances, exclusions, regional source basis and risk notes in the delivered report.

Ready to begin?

Complete the online intake, pay securely, and receive the finished estimate through your Kealee portal.

Start online · $349

100% of this package fee can be applied once toward eligible Kealee professional design or managed-build services for the same project. Credit requires a later written Kealee scope for the same project, cannot exceed that later service fee, has no cash value, is non-transferable, and cannot be combined with another purchase credit unless the written scope says otherwise.

Detailed Construction Estimate

$349

Start online